Synergy电池储能系统(BESS)概述.pdf

上传人: 芦苇 编号:1146437 2026-02-14 22页 1.81MB

1、Synergys Battery Energy Storage System(BESS)OverviewNimish Trivedi and Dom WatsonFuture Energy2Synergy in a snapshotWAs largest electricity generator and energy retailerGenerate6,500 GWhof electricity p.a1.1 million+electricity customersWorkforce of 1,500+employees and contractorsWEM in a SnapshotDe

2、mand(MW)Peak demand(record actual):4,486 MW at 6:30 pm,20 Jan 2025.Reserve Capacity Target(27-28):6,238 MWMinimum demand(record actual):511 MW on 10 Nov 2024;unscheduled minimum 474 MW same day.Minimum-demand outlook falls from 402 MW(2024-25)to 25 MW(2028-29)below zero from 2029-30(conceptual net s

3、urplus PV available for storage).Consumption(Energy)Underlying annual consumption:20 TWh Rooftop PV penetration:installed on 40%of SWIS homes&businesses.28 August 20253The SWIS faces record extremes from 4,486 MW summer peaks to just 511 MW minimums with rooftop PV reshaping consumption as residenti

4、al demand is increasingly supplied behind the meter.Demand(MW)and temperature(C)profiles covering the observed peak demand dayWEM in a SnapshotDemand(MW)Peak demand(record actual):4,486 MW at 6:30 pm,20 Jan 2025.Reserve Capacity Target(27-28):6,238 MWMinimum demand(record actual):511 MW on 10 Nov 20

5、24;unscheduled minimum 474 MW same day.Minimum-demand outlook falls from 402 MW(2024-25)to 25 MW(2028-29)below zero from 2029-30(conceptual net surplus PV available for storage).Consumption(Energy)Underlying annual consumption:20 TWh Rooftop PV penetration:installed on 40%of SWIS homes&businesses.28

6、 August 20254The SWIS faces record extremes from 4,486 MW summer peaks to just 511 MW minimums with rooftop PV reshaping consumption as residential demand is increasingly supplied behind the meter.Actual and forecast underlying electricity consumption by component,Expected scenario,2019-20 to 2034-3

word格式文档无特别注明外均可编辑修改,预览文件经过压缩,下载原文更清晰!
三个皮匠报告文库所有资源均是客户上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作商用。
1. **Synergy概况**:西澳最大发电商与零售商,年发电约6,500 GWh,服务110万+用户,员工1,500+人。 2. **电网挑战**:SWIS需求极端化,峰值达4,486 MW(2025年1月),最低仅511 MW(2024年11月);屋顶光伏渗透率40%,重塑用电模式。 3. **BESS部署**: - KBESS1:100MW/200MWh(2023年10月投运,CATL电池)。 - KBESS2:225MW/900MWh(2025年3月目标)。 - CBESS:500MW/2000MWh(2025年底目标)。 4. **交付模式**:从传统EPC转向集成商模式,联合GHD组建IPMT加速项目,分阶段并行建设。 5. **运营准备**:涵盖组织、资产、系统、人员及市场五大 readiness 支柱,确保BESS高效并网与运行。
**储能如何改变电网?** **BESS如何应对极端需求?** **储能项目如何加速交付?**