1、DOE Spent Nuclear Fuel Storage&Transportation ProgramDr.Erica BickfordDirector,Office of Storage&TransportationRadWaste SummitJune 10,2025Federal Consolidated Interim Storage Facility(CISF)Project Mission Need approved by US Department of Energys Energy System Acquisition Advisory Board(ESAAB),May 2

2、024 First stage in a multi-step approval process Project schedule estimates CISF to begin operations in 2038 Exploring options to build facility soonerRecent Accomplishments2Federal CISF3 DOEs reference concept for a Federal CISF:Initially licensed for 15,000 metric tons uranium(MTU)SNF Options to e

3、xpand to 70,000 MTU of SNF Licensed by the Nuclear Regulatory Commission(NRC)under 10 CFR Part 72 Start operations at 500 MTU/year receipt rate,ramp up to 3,000 MTU/year,possibly 4,500 MTU/year Transportation System Needs:Acquisition of railcars and Type B transport casks Armed courier program to es

4、cort shipments by rail Standard operating procedures and training requirements Training and technical assistance program for public safety officials in Tribal and State jurisdictions along transport routes Site-specific transportation plans Potential infrastructure upgrades near origin sites,etc.DOE

5、 Federal CISF Design Overview4Atlas railcar consist,including a 12-axle cask-carrying railcar,two buffer railcars,and rail escort vehicle certified by the Association of American Railroads for use in North America,June 2024 Provides a capability for DOE to transport spent nuclear fuel(SNF)and high-l

6、evel radioactive waste(HLW)by rail First shipment of SNF planned for 2027Recent Accomplishments5 High Burnup Research Cask(HBURC)is an R&D project started in 2014 as a collaboration between DOE and the Electric Power Research Institute(EPRI)Most new SNF is now high burnup Monitoring temperature of h

word格式文档无特别注明外均可编辑修改,预览文件经过压缩,下载原文更清晰!
三个皮匠报告文库所有资源均是客户上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作商用。
根据报告的内容,全文主要内容概括如下: - **联邦临时储存设施(CISF)项目**:由美国能源部(DOE)批准,预计2038年开始运营,旨在储存和运输核废料。 - **CISF设计**:初始容量为15,000吨铀(MTU)的乏燃料,可扩展至70,000 MTU,已获得核管理委员会(NRC)许可。 - **运输需求**:包括购买铁路车和Type B运输容器,武装护送、标准操作程序和培训,以及为沿途州和部落官员提供培训和协助。 - **Atlas铁路车**:用于运输乏燃料和高级放射性废物,预计2027年进行首次运输。 - **高燃耗研究容器(HBURC)**:自2014年起由DOE和电力研究协会(EPRI)合作研发,用于监测高燃耗燃料的温度。 - **国际合作**:与EPRI、德国、比利时、英国、瑞士、西班牙和日本等国家探讨合作,以集中研发资源。 - **先进反应堆废物管理**:DOE计划与反应堆运营商签订修订后的标准合同,以降低先进反应堆部署的风险。
2027首航计划" 2038启航?" 研发新篇章?"
客服
商务合作
小程序
服务号
折叠