水晶河3号(CR3)反应堆压力容器处置.pdf

上传人: 可*** 编号:991663 2025-12-07 19页 1.61MB

1、Crystal River 3(CR3)Reactor Vessel Disposal2Crystal River Unit 3 ReactorPressurized Water Reactor B&W designShutdown September 2009Decommissioning started in October 2020NorthStar Nuclear Decommissioning and Orano USA are performing the workWaste Control Specialists provides waste management service

2、s and disposal3CR3 Reactor SectionsOrano performed the cutting,packaging,and transportationThe reactor vessel was cut into 4 sectionsSections met all NRC and DOT packaging requirements for transportationDiameter(feet)Height(feet)Weight(tons)Vessel Head17895Top Section1913370Mid Section1715430Bottom

3、Section157954CR3 Reactor Vessel-TransportationBarge from Crystal River,FL to Aransas Pass,TXTruck transport to WCS site in Andrews,TX5CR3 Reactor Vessel Barge TransportDeparted Crystal River January 22Arrived Aransas Pass January 297CR3 Reactor Vessel Road TransportTop and Mid Sections configuration

4、 32 axle trailer(more than 250 wheels)Routes and transportation parameters were predetermined by TXDOTHead and Bottom Section required about 4 days each(700-mile route)Top and Mid Sections required over 30 days each(900-mile route)9Transportation Challenges11Arrival at WCS12On-Site Transport13Transp

5、ort to Disposal14Disposal Placement15Final DisposalWaste Control SpecialistsTransportation17Compact FacilityFederal FacilityHazardous Waste LandfillByproductFacilityAdministration BuildingsTreatment Facilities Rail OffloadWCS Site Facilities14,000 acres(permitted area is 1,400 acres)4 landfills,RCRA

6、&Rad treatment facilitiesOver 9 miles of rail serve the site18Highway Transportation2024 Highway Volume750 shipments4,000 containers600,000 cubic feet19Rail TransportationWCS has has the only rail line in Andrews CountyOperates 3 locomotive

word格式文档无特别注明外均可编辑修改,预览文件经过压缩,下载原文更清晰!
三个皮匠报告文库所有资源均是客户上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作商用。
Crystal River 3 (CR3)反应堆的退役和处置工作正在进行中。关键点如下: - 反应堆于2009年9月停机,2020年10月开始退役。 - NorthStar Nuclear Decommissioning和Orano USA负责工作,Waste Control Specialists提供废物管理和处置服务。 - 反应堆容器被切割成4个部分,满足NRC和DOT的包装要求。 - 容器部分通过驳船从佛罗里达州Crystal River运至德克萨斯州Aransas Pass,再通过卡车运输至WCS处置地点。 - 驳船运输于1月22日出发,1月29日到达。 - 车辆运输中,顶部和中部部分使用32轴拖车,头部和底部部分分别需要约4天和30多天完成900英里路线。 - WCS处置地点占地14,000英亩,拥有4个垃圾填埋场、RCRA和辐射处理设施,以及超过9英里的铁路线。
"CR3反应堆运输挑战揭秘" CR3的旅程" 从切割到处置的旅程"