1、SouthwestPowerPoolSPPorgsouthwest-power-poolWorking together to responsibly and economically keep the lights on today and in the future.POWER SUMMIT 2025CASEY CATHEY,PEVICE PRESIDENT,ENGINEERINGOCTOBER 1,20252ACCELERATING GENERATION3DEFINITIVE INTERCONNECTION SYSTEM IMPACT STUDY(DISIS)PROCESS(TODAY)

2、Phase 1Phase 2Facility StudyGIARestudyWithdraw60 days120 days60 days60 days60 daysIntake/Model BuildOpen Window for 11 MonthsPlannedUnplanned*For example purpose only.Actual implementation still in discussionCluster study where all projects from the yearly window are studied togetherOnly 20-40%of su

3、bmitted projects make it through the entire processLow Cost Certainty since lot of projects can withdraw at any time causing upgrades to change or no longer be needed.Additional Restudies required for late stage withdrawsWithdrawWithdraw4SPP Internal OnlyAPPLICATION REQUIREMENTSGeneral Project infor

4、mation(Contact,Location,Size,etc)Technical Specification of ProjectsStudy DepositCash,Letter of Credit,or Surety Bond SecuritiesSite Control5SPP Internal OnlyGENERATION INTERCONNECTION AGREEMENTS(GIA)New policies,processes&and automation improvements to the DISIS study allow SPP to deliver GIAs with

5、in 1.5 year from submission time.Processing record levels of GIA as it clears the backlog of projects and able to process more requests per study.158633804470516034404722115546593180002200002040608010012014005000100001500020000250002017201820192020202120222023202420252026Year GIA processedVolume Tre

6、ndsNew Generation that Received GIA(MW)CapacityCountAnticipated amount1.61.32.13.74.96.15.954.53.52.51.51050100150200250300350400450012345672013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024CPP2026YearsYear Request was SubmitedTime from Request to GIACompletedProjected#Submitted Projects6SP

word格式文档无特别注明外均可编辑修改,预览文件经过压缩,下载原文更清晰!
三个皮匠报告文库所有资源均是客户上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作商用。
1. **发电并网流程优化**:SPP通过改进DISIS流程,将发电并网协议(GIA)签发时间从18个月缩短至7个月(规划项目),并提升成本确定性。 2. **装机容量增长**:预计至2030年新增超30GW装机容量,未来3年每年新增约6GW+,2025年GIA处理量达5160个。 3. **输电规划升级**:采用整合输电规划(ITP)及统一规划流程(CPP),预计2035年峰值负荷达110GW,避免重复建设可节省超1亿美元/年。 4. **CPP核心效益**:减少75%的重新研究成本(年省150万美元),通过GRID-C成本分配机制实现成本分摊与风险透明化。 5. **资源中立与透明**:并网流程对可再生能源与基荷资源一视同仁,通过公开研究报告提供可行性及成本透明度。