电力需求激增:PJM未来的电力需求.pdf

编号:1160957 PDF 19页 3.22MB 下载积分:VIP专享
下载报告请您先登录!

1、PJM |PublicAmped Up:PJMs Future Power NeedsWEST VIRGINIA ENERGY SUMMITAsim Z.HaqueSVP,Governmental and Member ServicesPJM InterconnectionNovember 13,2025PJM |PublicPJM as Part of the Eastern Interconnection As of 2/2024 26%of generation in Eastern Interconnection 25%of load in Eastern Interconnectio

2、n 20%of transmission assets in Eastern Interconnection21%of U.S.GDP Produced in PJMKey StatisticsMember companies1,090Millions of people served67+Peak load in megawatts165,563Megawatts of generating capacity180,785Miles of transmission lines88,185Terawatt hours of annual energy770Generation sources1

3、,439Square miles of territory368,906States served13+DCPJM |PublicPJM The OrganizationOperates As A Non-ProfitNo Shareholders or Share PriceFederally Regulated(FERC)Independent BoardMarket MonitorMission-DrivenPJM |PublicGRID RELIABILITYPJMs Primary FocusOperationsGrid operationsSupply/demand balance

4、Transmission monitoringRegional Planning 15-year outlookMarkets Energy Capacity Ancillary servicesPJM |PublicPJM |PublicNERC:Long-Term Reliability Assessment Graphic:NERCPJM |PublicElectricity Demand GrowthPJM |PublicData Center ProliferationPJM |PublicThe summer and winter peak megawatt values refl

5、ect the estimated amount of forecast load to be served by each transmission owner in the noted state/district.Estimated amounts were calculated based on the average share of each transmission owners real-time summer and winter peak load in those areas over the past five years.West Virginia 2025 Load

6、 Forecast ReportPJM |PublicSupply and DemandPJM Region(MW)2025 Supply181,533 2025 Demand(Peak Summer)160,5262040 Demand(Peak Summer)212,000PJM |PublicState Import/Export DynamicsPJM |PublicCapacity Market PricingRTO Price Comparison2025/20262024/2025RTO Price:$269.92/MW-day$29/MW-dayReserve Marginwi

友情提示

1、下载报告失败解决办法
2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
4、本站报告下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。

本文(电力需求激增:PJM未来的电力需求.pdf)为本站 (五万多头猪) 主动上传,三个皮匠报告文库仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知三个皮匠报告文库(点击联系客服),我们立即给予删除!

温馨提示:如果因为网速或其他原因下载失败请重新下载,重复下载不扣分。
客服
商务合作
小程序
服务号
折叠