当前位置:首页 > 报告详情

TROLIE - 推出用于交换输电设施评级的开放一致性标准.pdf

上传人: s****e 编号:944312 2025-10-19 16页 1.49MB

1、TROLIE:OPEN-SOURCE STANDARD FOR TRANSMISSION FACILITY RATING EXCHANGETory McKeag Principal Software Architect,markets products,GE Vernova LFE Summit North America 2025 Montreal October 3,2025 2025 GE Vernova and/or its affiliates.All rights reserved.The problem:No Standard to support FERC order 881N

2、o standard exists!2025 GE Vernova and/or its affiliates.All rights reserved.2881 in a nutshell:From static/seasonal to Ambient Adjusted Ratings(AAR)From couple of times a year to every hourReal time&10 days forecast ratingsExchanges within the ecosystem for operations&history and tight deadlines!The

3、 4 Cs challengesCommunication?Coordination?Conventions?Cybersecurity?An Interop StoryIsobel Isobel is an ISOISO.Rita Rita is anRTORTO.Owen Owen is a Transmission Owner.Owner.Remy Remy is aREMC.REMC.OpalOpal is a Transmission Operator.Operator.Rich Rich is a non-FERC jurisdictionalRCRC.3An Interop st

4、oryRemy(REMC)submits the most limiting ratingsof their owned equipment to Rita(RTO)Rich(RC)submits ratingsto Isobel(ISO)Owen(TO)delegates theirratings obligation to Opal(TOp)Opal(TOp)submits ratings toRita(RTO)Isobel(ISO)and Rita(RTO)need to exchange the most limiting facility ratings from their reg

5、ion to determine the most limiting global ratingThe simplest use caseRitas(RTO)responsibilities includeUse real-time,forecast and seasonal ratings from Opal in operational decisions(EMS,markets,outage coordination,planning,etc.)Potentially determine limits based on stability analysis.Opals(TOp)respo

6、nsibilities includeCompute real-time and forecast ratings at least hourly for use in operations,determine seasonal ratings,and share all with Rita.Use the same limits as Rita in operations.4Complexity added by Vendor LandscapeVendor 1makes EMS and market softwareVendor 2makes EMS and outage manageme

word格式文档无特别注明外均可编辑修改,预览文件经过压缩,下载原文更清晰!
三个皮匠报告文库所有资源均是客户上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作商用。
根据报告的内容,全文主要内容概括如下: - **背景问题**:缺乏支持美国联邦能源监管委员会(FERC)第881号命令的标准。 - **881号命令要点**:从静态/季节性调整到环境调整率(AAR),从每年几次到每小时一次,实时和10天预报率,生态系统内的交换,以及紧迫的截止日期。 - **挑战**:沟通、协调、公约和网络安全。 - **TROLIE项目**:一个开源项目,旨在设计并推广一个开放标准,用于通信输电评级、操作限制和相关信息。 - **TROLIE目标**:开放API规范、符合性计划、TROLIE API客户端开发。 - **TROLIE现状**:发布1.0规范,Java客户端SDK,符合性测试套件。 - **社区发展**:指导委员会、参与者和贡献者。 - **未来方向**:支持FERC 881的实施,开发新的互操作性功能和数据交换标准。
电力传输的未来?" TROLIE如何简化电力数据交换?" TROLIE如何应对挑战?"
客服
商务合作
小程序
服务号
折叠