《从电力压力到电力战略——设施电力当前挑战与解决方案的洞察.pdf》由会员分享,可在线阅读,更多相关《从电力压力到电力战略——设施电力当前挑战与解决方案的洞察.pdf(5页珍藏版)》请在三个皮匠报告上搜索。
1、Insights to the current challenges and solutions with Power in the FacilityFrom Power Strain to Power Strategy OCP SPECIAL FOCUS:MARKET IMPACT&OCP ADOPTION STORIESPanel DiscussionRob CoyleDirector of Technical Programs OCP FoundationJP BuzzellVP,Data Center Chief ArchitectureEATONPaolo CatapaneChapt
2、er Leader Solution Product ManagementABBData Center Facility Power DistributionThe aim of this Sub-Project is to increase power density and enable next generation compute.In Scope:Evolution to LVDC distribution inside the datacenter including backward compatibility and future scalability.Collection
3、of best practices for design,build,and operation of LVDC systems.Connection with industry alliances and standards bodies regarding direct current efforts.Estimate timeline for transition to LVDC.Energy Storage Systems-ESSNew Sub-ProjectWhite paper with narrative for direct current adoption(Target Release:2026 Q1)Detailed specs of system components will need to be addressed in separate workstreamsRecommended Reference LVDC System ArchitectureInitial Work Productshttps:/www.opencompute.org/projects/power-distributionJoin the Sub Project