《嘉实多与IEIT Systems就液冷技术建立战略合作伙伴关系——嘉实多公司发布.pdf》由会员分享,可在线阅读,更多相关《嘉实多与IEIT Systems就液冷技术建立战略合作伙伴关系——嘉实多公司发布.pdf(8页珍藏版)》请在三个皮匠报告上搜索。
1、Castrol&IEIT Systems Strategic Partnershipon Liquid CoolingDavid Leung-IEIT SystemsMiguel Navarro-bp CastrolOCP EMEA Summit Day 1Challenges in Intelligent Computing Power Construction of Large ModelThe traditional engineering model has a long construction period and great delivery pressureThe comput
2、ing power and power consumption per unit space of the intelligent computing center are rising and cannot be smoothed out3-5 years3-5 years3-5 years10-15 yearsIT Life CycleDC Life CycleConstruction:3 yearsWith the popularization and development of the new AIGC business model,the business needs of lar
3、ge models,the sudden increase in IT density,and the rising energy consumption,the construction of AIDC faces many challenges.0100200300400500600700800GPU v.s CPU TDP Trend(W)NVIDIA GPUIntel CPUThe traditional method has a long construction period and cannot upgrade to the new generation of technolog
4、y in time,which leads to the dilemma of being outdated as soon as it is built.Row-level Computing Power Modules,Large-scale&Efficient DeploymentPOD level deploymentWide geographical deploymentSafety&ReliabilitySingle-row/double-row POD design,single POD with 16 cabinets for deploymentHigh reliabilit
5、y(CDU by 2N/N+1 deployment)High performance Megawatt-level CDU(the max.water temperature on the primary side is 41C)CDU extreme performance mode(solves the problem of high inlet water temperature in tropical areas)Convenient O&M(upper pipe routing,2-layer design)High reliability water collection tra
6、y,leakage monitoring system,pipeline leakage monitoringImproved safety(cutting out the cabinet liquid supply system when leakage occurs)Prefabricated Computing Power Factory Improves Deployment EfficiencyHighly integratedStandard 40-foot containers,integration of liquid cooling c