中国钢铁公司低碳高炉项目进展情况.pdf

编号:991957 PDF 18页 6.67MB 下载积分:VIP专享
下载报告请您先登录!

1、Progress of Low Carbon Blast Furnace Initiatives at CSC1Brief Introduction of CSCCountermeasures for Carbon ReductionEfforts toward a Low-Carbon BF Reduced Iron Charging Hydrogen-Rich Gas injection TestSummaryworldsteelThe Breakthrough Technology Conference 2025 in SingaporeSpeaker:Huang Tsung-YenIr

2、on Making Process Development Section,R&D Dept.,China Steel Corporation(Taiwan)Date:Dec.2-3,2025Brief Introduction of CSC2 CSC Group is the only integrated and largest steel mill in Taiwan,with a designed annual hot metal output of 15 million metric tones by 6 BFs and 1 EAF.The production processes

3、include BF Ironmaking,BOF Steelmaking,Continuous Casting,and Hot/Cold Rolling.Generally,an integrated steel mill generates a large amount of CO2since its blast furnace ironmaking is coal-based process,which consumes around 75%energy of the mill.3Pathways for CSC to achieve Carbon Neutrality in 2050-

4、1%/yr 2025(base year)Planning multiple pathwayCCS technology:Low carbon BFCarbon-free BFMake greater efforts to improve energy efficiencyRenewable energyReplace coal injection with hydrogenCharge low carbon ferrous burden into BFCo-productionbetween steel and petrochemical plantsIncrease scrap use H

5、ydrogen reduction process:Iron OreDRIEAFSteelCarbon-free fuelElectrification2210-7%-25%Establish necessary resources fortechnical deployment,ensure sufficient fundingChoose the most optimisedpathway with the best technology maturity,cost-effectiveness,and ability to produce premium steel.Carbon Neut

6、ralCarbon emissions(ten thousand tons)Process improvement and simplificationWaste heat recovery;CogenerationCombustion control;Temperature control optimizationImprove yield and equipment efficiencyEnergy dispatch;smart management To optimize the energy efficiency and to use the renewable energy have

友情提示

1、下载报告失败解决办法
2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
4、本站报告下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。

本文(中国钢铁公司低碳高炉项目进展情况.pdf)为本站 (可不可以) 主动上传,三个皮匠报告文库仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知三个皮匠报告文库(点击联系客服),我们立即给予删除!

温馨提示:如果因为网速或其他原因下载失败请重新下载,重复下载不扣分。
客服
商务合作
小程序
服务号
折叠