Brattle Group:2024发电机并网成效评估报告:美国七大区域输电运营商并网成效及流程排名(英文版)(72页).pdf

编号:616131 PDF  中文版  DOCX 72页 4.02MB 下载积分:VIP专享
下载报告请您先登录!

Brattle Group:2024发电机并网成效评估报告:美国七大区域输电运营商并网成效及流程排名(英文版)(72页).pdf

1、 Generator Interconnection ScorecardRanking Interconnection Outcomes and Processes of the Seven U.S.Regional Transmission System Operators February 2024 Authors|John D.Wilson,Richard Seide,Rob Gramlich,and J.Michael HagertyPrepared for Advanced Energy United with funding from the Advanced Energy Ins

2、tituteWith Contributions FromJohannes Pfeifenberger and Abigail ShermanAcknowledgementsThe authors appreciate the expert review provided by Will Gorman of Lawrence Berkeley National Laboratory(LBNL),staff of Advanced Energy United,Fulin Zhuang of GridBright,and the participants in interviews with in

3、terconnection customers,as listed in the Appendix.1 The authors also appreciate the assistance of LBNL for providing essential data.1 All organization references are provided for identification purposes only.This report reflects the professional findings and opinions of the study authors and no endo

4、rsement of the findings by those recognized for their valuable contributions is implied.CONTENTSExecutive Summary 51|The Purpose of the Generator Interconnection Scorecard 92|The Generator Interconnection Process 103|Approach to Developing the Scorecard 15 3.1.Scorecard Categories and Metrics 15 3.2

5、.Evidence Relied on for Scoring Interconnection Processes 164|Generator Interconnection Scorecard Results 185|Scorecard Detailed Results and Discussion 21 5.1.Interconnection Process Results 21 5.1.1.Speed:Length and predictability of study and network 22 upgrade process 5.1.2.Regional assessments o

6、f interconnection speed 26 5.1.3.Interconnection Costs:Cost uncertainty a larger 31 concern than total costs 5.1.4.Regional assessments of interconnection costs 35 5.2.Pre-Queue Information 38 5.3.Interconnection Study Process 42 5.3.1.Staff resources are inadequate in every respect 43 5.3.2.Transpa

友情提示

1、下载报告失败解决办法
2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
4、本站报告下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。

本文(Brattle Group:2024发电机并网成效评估报告:美国七大区域输电运营商并网成效及流程排名(英文版)(72页).pdf)为本站 (Kelly Street) 主动上传,三个皮匠报告文库仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知三个皮匠报告文库(点击联系客服),我们立即给予删除!

温馨提示:如果因为网速或其他原因下载失败请重新下载,重复下载不扣分。
客服
商务合作
小程序
服务号
折叠