7-EDL-SHARE-Practice and Development Demands of Distribution Network Construction in the Lao PDR 13-11-25-1.pdf

编号:1035725 PDF 14页 4.46MB 下载积分:VIP专享
下载报告请您先登录!

1、Practice and Development Demands of Distribution Network Construction in the Lao PDREnhancing Efficiency,Reliability,and Smart Grid IntegrationPresented by:Mr.Thavy KHAMCHALEUNElectricit du Laos(EDL)November 2025Presentation OverviewTo establish a roadmap for modernizing the Lao distribution network

2、 through effective cooperation Current State AssessmentChallenges&DemandsCollaborative OpportunitiesStrategic Development PlanEnhancing Efficiency,Reliability,and Smart Grid IntegrationTotal installed capacity:4,930.85 MW across 103 power plantsDistribution losses reduced from 10.60%(2022)to 9.22%(2

3、024)Peak load in 2025(first 6 months):1,969.24 MWLaos aims to become the Battery of Southeast Asia through regional power tradingTotal Transformer Capacity8,340.5MVA across all regionsLow Voltage Network23,155circuit-km of 0.4 kV linesTotal Substations10881 operated by EDL,27 by IPPsTransmission Lin

4、es75,486circuit-km across all voltage levelsLao PDR power sector overviewTransformer Distribution and Capacity by Region Key Findings Central region has the highest transformer capacity(3,485,791 kVA)despite having fewer transformers than the South.The South region has the most extensive low voltage

5、 network(10,052 km),indicating broader distribution coverage.North RegionTransformers12,710Capacity2,795 MVALV Network6,306 kmCentral RegionTransformers15,004Capacity3,486 MVALV Network6,797 kmSouth RegionTransformers13,898Capacity2,060 MVALV Network10,052 kmCurrent State of Distribution Network97%N

6、ational Electrification Rate9.22%Distribution Loss(2024)Infrastructure Overview Primary voltage:22kV,35kVSecondary voltage:0.4kV81 EDL substations and 27 IPP substations Technology Standards Primarily overhead lines with limited underground cablesMix of conventional and initial smart meter deploymen

友情提示

1、下载报告失败解决办法
2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
4、本站报告下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。

本文(7-EDL-SHARE-Practice and Development Demands of Distribution Network Construction in the Lao PDR 13-11-25-1.pdf)为本站 (data) 主动上传,三个皮匠报告文库仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知三个皮匠报告文库(点击联系客服),我们立即给予删除!

温馨提示:如果因为网速或其他原因下载失败请重新下载,重复下载不扣分。
客服
商务合作
小程序
服务号
折叠