1、 Glencore Q1 2023 Production Report 1 NEWS RELEASE Baar,21 April 2023 First Quarter Production Report 2023 Glencore Chief Executive Officer,Gary Nagle:“First quarter production was broadly in line with our expectations,accounting for portfolio changes and operational conditions,including the disposa
2、ls/closures of some zinc and lead mines in the Americas during 2022.Full year production guidance is unchanged from that presented at Glencores investor presentation in December 2022.“Our Marketing segment continued to perform well through Q1 2023,particularly within energy products,such that extrap
3、olating Q1s Marketing Adjusted EBIT has us,once again,on track to exceed the top end of our$2.2-3.2 billion p.a.long-term guidance range.”Production from own sources Total1 Q1 2023 Q1 2022 Change%Copper kt 244.1 257.8 (5)Cobalt kt 10.5 9.7 8 Zinc kt 205.3 241.5 (15)Lead kt 39.3 46.8 (16)Nickel kt 20
4、.9 30.7 (32)Gold koz 187 189 (1)Silver koz 4,525 6,515 (31)Ferrochrome kt 400 387 3 Coal mt 26.9 28.5 (6)1.Controlled industrial assets and joint ventures only(excludes Volcan).Production is on a 100%basis,except as stated later in this report.Q1 production highlights Own sourced copper production o
5、f 244,100 tonnes was 13,700 tonnes(5%)lower than Q1 2022,largely due to planned lower grades in line with the phasing of the pit at Collahuasi and delays associated with adverse weather conditions at Antamina.Own sourced zinc production of 205,300 tonnes was 36,200 tonnes(15%)lower than Q1 2022,refl
6、ecting the disposal of South American zinc operations(14,400 tonnes)and the closure of Matagami(8,900 tonnes)in 2022,temporary suspension of operations due to wet weather at Antamina(5,900 tonnes)and McArthur River temporarily processing lower-grade feedstocks in accordance with its mine plan(4,700