1、 Author:Joel Maisey,Tania Fernandez,Lee Martin,Haydn Purnell,Hashim Amjad,Toby Gard Date:14/02/2025 Reference:PN000658-RPT-007 Status:Public In partnership with:FLOATING OFFSHORE WIND CENTRE OF EXCELLENCE DC02-SUBSEA VS FLOATING SUBSTATIONS PUBLIC REPORT DC02-Subsea vs Floating Substations Public Re

2、port 14-Feb-2025 ORE Catapult Public 2 PN000658-RPT-007 Rev 3 DISCLAIMER Whilst the information contained in this report has been prepared and collated in good faith,ORE Catapult makes no representation or warranty(express or implied)as to the accuracy or completeness of the information contained he

3、rein nor shall we be liable for any loss or damage resultant from reliance on same.DOCUMENT HISTORY Revision Date Prepared by Checked by Approved by Revision History Rev 1 17-Jan-2025 TG/LM/HP JM CSM Issued for review Rev 2 05-Feb-2025 LM JM CSM Issued for use Rev 3 14-Feb-2025 JM JM CSM Issued for

4、use DC02-Subsea vs Floating Substations Public Report 14-Feb-2025 ORE Catapult Public 3 PN000658-RPT-007 Rev 3 EXECUTIVE SUMMARY The offshore wind sector is transitioning from fixed to floating wind farms at a GW scale,necessitating an understanding of substation selections technical and economic im

5、plications.This study aims to inform developers on supply chain engagement and substation delivery,focusing on HVAC floating and subsea substations.Inter-array and export cables are outside the scope of this study but have been considered at a high level when required.Subsea Substations The greatest

6、 benefit of the subsea substation is the lack of requirement for dynamic export cables and the standardisation of the design,enabling an almost cookie-cutter approach.Transformer size impacts the cables architecture,export cable quantity,and cross-sectional area(CSA).Subsea substations require less

word格式文档无特别注明外均可编辑修改,预览文件经过压缩,下载原文更清晰!
三个皮匠报告文库所有资源均是客户上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作商用。
根据报告的内容,本文主要比较了海底变电站和浮式变电站的技术和经济性。关键点如下: 1. 海底变电站技术相对成熟,可靠性高,运维成本低,但初期投资高。浮式变电站设计基于海洋油气行业,技术成熟度高,但存在电气设备疲劳不确定性。 2. 海底变电站的运维成本最低,但初期投资最高。浮式变电站的运维成本高于海底变电站,但初期投资较低。 3. 海底变电站面临较少的安全和环境风险,而浮式变电站面临较高的安全和环境风险。海底变电站的可靠性更高,故障影响较小,但维修难度大。浮式变电站的可靠性较低,需要更多维护,但维修成本较低。 4. 选择海底或浮式变电站需要综合考虑多种因素,包括开发商经验、风险偏好、技术进展等。海底变电站的初期投资虽高,但运维成本低,可靠性高。浮式变电站的初期投资较低,但运维成本高,可靠性较低。 5. 需要进一步研究海底变电站的高压设备、维修成本,以及浮式变电站的动态电缆、安装要求等。
浮动还是海底? 成本与风险比较 浮动还是海底,哪个更可靠?
客服
商务合作
小程序
服务号
折叠